Outer Banks Pool Resurfacing & Replastering

Outer Banks Pool Resurfacing & Replastering

Fresh Diamond Brite Commercial White plaster at the Bermuda Bay water park in Kitty Hawk, resurfaced by Four Seasons Pool Builders

Pool Resurfacing

Is Your Pool Ready for a Fresh Finish?

Plaster doesn't last forever, especially at the beach. Sun, salt air, sand and years of chemicals slowly wear down even a well-kept finish.

We've resurfaced many concrete pools from Corolla to Nags Head, and we can bring yours back to life with a smooth, durable SGM Diamond Brite quartz finish, backed by a 1-year warranty.

Older Outer Banks pool drained before replastering

Signs It's Time

It May Be Time to Replaster If You Notice:

  • Rough or uncomfortable surfaces
  • Stains or discoloration
  • Cracks, pitting or worn spots
  • An outdated finish or color
  • Plaster that is flaking or showing its age

Our Process

How We Resurface a Pool

  1. 1

    Drain Safely

    On a barrier island the groundwater sits close to the surface, and an empty pool can be pushed up out of the ground. We check conditions and relieve groundwater pressure before and during draining.

  2. 2

    Prepare the Surface

    We remove loose and failing plaster and clean the shell down to a solid base. Good prep is what makes a new finish last.

  3. 3

    Bond Coat

    A bonding layer helps the new finish grip the old shell instead of separating from it later.

  4. 4

    Tile, Coping & Fittings

    The right time to replace waterline tile and coping and update lights and fittings, so you only drain the pool once.

  5. 5

    Plaster Day

    A professional crew applies the quartz plaster in one continuous day and trowels it smooth, with us overseeing. Filling starts right away and doesn't stop until the pool is full.

  6. 6

    30-Day Startup

    New plaster needs careful chemistry and daily brushing while it cures. Our sister company, Four Seasons Pool & Spa Services, handles the startup (billed separately). Why it matters

Four Seasons crew installing new waterline tile before plaster at the Bermuda Bay water park
New tile & coping
Plastering crew preparing a drained pool for new plaster
Surface prep
Finished quartz plaster ready to fill
Finished, ready to fill
  • Finish It Off Right

    • New quartz plaster
    • New pool coping
    • New waterline tile

    See our pool finishes

  • Upgrade Your Equipment While You're at It

    • Energy-efficient heating
    • Pump, filter and plumbing repairs
    • Salt systems and automation

    See the equipment we install

More on Renovating

Let's Take a Look at Your Pool

Call or text Colin at (252) 207-5001 for a free, no-obligation estimate, or request one online.

Four Seasons Pool Builders · NC General Contractor License #84119 · Serving Corolla to Nags Head